EIPlus

ABN 74 115 843 565

Engineered Implementation and Compliance Specialist

Melbourne, Australia

Call: Tom Stephanou  +61 (0) 409 416 711

Email: tomstephanou@eiplus.com.au

EIPlus Capability Statement

Project Management

Project Management Details

Power Plant Optimisation

Engineering Studies

Quality Expediting

Introducing EIPlus

 EIPlus is a newly formed company of highly skilled Engineers and Project Managers focused on delivering engineered solutions to the power generation and energy intensive industries across Australia. Our aim is to improve and stabilise the operating performance and reliability of generating plant, whilst maximising the return on capital investments to asset owners and improve electricity revenue.

We have extensive knowledge of all the thermal power stations across Australia, having successfully completed many complex and technically challenging projects for clients such as Western Power (Synergy), AGL-Macquarie Generation, Delta, GDF Suez, Energy Australia, Intergen, Stanwell, International Power as well as power plants in Malaysia, Philippines and Indonesia.

Using a range of software tools and the knowledge gained from years working on implementation and R&D projects, EIPlus Engineers have successfully resolved a range of complex problems, providing cost effective and practical solutions, including:

  • Flowability of bulk solids in pressurised storage and transfer vessels and conveying of bulk solids and slurries along long distance piping;
  • Changes in coal quality over the life of the station resulting in reduced energy conversion, higher rates of ash fouling, resulting in poor boiler combustion and reduced plant availability;
  • Optimisation of plant to improve thermal heat transfer and steam cycle efficiencies, improving economiser performances, condenser and cooling tower performances;
  • Improving the safe operation and maintenance of furnace bottom ash extraction by retrofitting proven dry bottom ash technology a cost effective alternative to wet ash hoppers and submerged scrapper chain systems that are less reliable and require higher maintenance to manage the effects of corrosion, high wear and seizure of rotating;
  • Surveying of hangers and re-floating of high energy steam piping using displacement data captured using video imaging to compare results against historical data from previous inspection to determine deviations in movements against baseline flexibility analysis results;
  • Managing the performance testing of boiler and turbine plant, establishing rates of unburnt carbon in ash, measuring temperature and velocity profiles in ducts to identify maldistribution in gas passages used to design of flow straightening vanes in primary and secondary air ducts, high temperature turning vanes in HRSG and fuel distribution vanes in mills;
  • Design and construction of low temperature attemperation systems to cool flue gases during summer period of high temperature, extend fabric filter bag life, and improve collection efficiencies in precipitators to maximise power generation and revenue from contracted electricity sales. This proven system provides additional benefits, including lower power consumption for ID fans, flexibility in the choice of less expensive filter bags, system can automatically adjust to accommodate changes in operations to account for transient higher moisture coal during winter;
  • Developing new waste from energy plants using renewable fuels such as wood recovered from timber sawmills and forestry operations, timber recovered from construction and demolition and power plants utilising municipal waste diverted from landfill sites to generate electricity and process steam, reducing reliance on fossil fuels and the increased cost for NG and LPG.
  • Introduction of CFB boilers that have fuel flexibility and low capital cost for steam supply and power generation schemes including waste to energy projects.
  • Developing new processors for drying, carbonising and converting coal into high value industrial products from the gasification of coal to produce syngas.

Complementing our Engineered Implementation capabilities is our knowledge of ISO 9000 Quality Assurance and the various Standards associated with the design, manufacture, construction and testing of operating plant and equipment, ensuring fit for purpose that EIPlus engineered solutions are relevant and compliant to Australian and International Standards, and to ensure regulatory requirements for the safe operation of plant are met.

 EIPlus have conducted numerous audits of workshops as a precursor to commencing manufacture in order to verify that robust quality systems and procedures are in place and followed and that finished products have been manufactured to an acceptable standard. This is most important when plant and equipment are procured from developing countries such as China, India, Vietnam etc. where sufficient testing and verification by accredited inspectors, particularly surveillance of welds in the manufacture of vessels and steel structure.

 EIPlus can mobilise staff at short notice regardless of location and offer competitive rates that can be structured to suit our client’s specific requirement.

I would like to thank you for taking time to read through this introductory brief on the range of services EIPlus can provide and invite you to consider EIPlus when next you require an engineered solution.

For more information about EIPlus, please refer to our webpage, www.eiplus.com.au.

For all other enquiries, including request for quotations, please direct them to myself or to EIPlus at info@eiplus.com.au.

Again I would like to thank you for your support and look forward to continuing our relationship into the future.

 Kind Regards

Tom Stephanou

Business Development Manager

EIPlus, Engineered Implementation and Compliance Specialist

M: +61 (0) 409 416 711

E: tomstephanou@eiplus.com.au